STS45E G2

Click to
zoom in

Description

The Bromma STS45E G2 PLUS is the world’s fastest all-electric twin-lift separating spreader — built to deliver full productivity with zero hydraulics. Designed for demanding ship-to-shore operations, it combines high lifting capacity, superior energy efficiency, and silent, low-maintenance performance. Handles a full range of container sizes — from single 20’ to twin 20’, and up to 45’.

Major Features

  • Up to 90% lower power use than a hydraulic spreader — directly cutting crane energy costs and emissions.
  • No hydraulics, no oil, no leaks.
  • Quieter operation and cleaner environment for people and port.
  • High-strength steel structure and box-beam design deliver low tare weight and high lifting capacity
  • Fast telescoping and twin-separating speeds, service-friendly layout.

Specifications

Lifting capacity

  • One container 51 metric tons evenly loaded
  • One container 51 metric tons ±10% eccentric loading
  • Twin-lift of two 20’ containers 2 x 32.5 metric tons evenly loaded
  • Lifting lugs 4 x 12.5 metric tons in the main frame and end beams

Separating capacity

  • 0-1600 mm with full load

Weight

  • 12.6 metric tons (without extra equipment)

Max Power consumption

  • 11 kW

Telescopic motion

  • Telescopic motion 20’ to 40’ approximately 18 sec.
  • Telescopic motion 20’ to 45’ approximately 21 sec.

Flipper arm speed

  • 180° in approximately 5 sec

Twistlock rotation

  • ISO floating 90o in approximately 1 sec.

Twin-lift unit up/down

  • Approximately 6 sec

Standard twistlock torque

  • Min. 300 Nm

Twin expand/retract

  • Approximately 15 sec.

Power supply

  • 400/230 V AC 50 Hz or otherwise as agreed

Control system

  • SCU, RML, Spreader Information Display and BTU

Design standard

  • EN13001; DIN 15018 H2B4; FEM 1.001; British Standard BS 2573

Mechanical structure calculations criteria

  • Designed based on calculations according to EN13001, U7, Q3, HC2, HD1

Video